MEDCEM ÇiMENTO TESİSİ / ROLLER PRES VE BİLYALI ÇİMENTO DEĞİRMENİ - 220 Ton/Gün Çimento
1 / 6

PROJE YILI

2020-9 MONTHS

TESİS SAHİBİ

Eren Holding

ANA YÜKLENİCİ

ABB Elektrik

PROJE BEDELİ

Mersin - Silifke

ECF Kapsamı Özeti

Engineering, Project Planning
Supply of LV MDB and LV MCC Panels
Supply of Measurement and Control Systems
Field Assembly Equipment Supply and Installation Services
Lighting and Grounding Systems Supply
Energization and Commissioning Services

ECF, which undertakes the work of Electrical Systems and technological equipment in this enterprise, which has the distinction of being the only or even the largest facility in Europe and Turkey,

The Main Contractor is ABB Elektrik San A.As a subcontractor affiliated to Ş Company, Jul has performed field installation, field equipment supply, installation and commissioning services of the entire facility

We are justifiably proud to be located in such an important facility that we have worked and completed for about 9 months within the scope of ECF.

Anadolu Organize Sanayi Bölgesi 7. Cad. 12. Sok No:21 Malıköy-Sincan-ANKARA
info@ecfmuhendislik.com.tr

Our Understanding of Quality

    With our customer satisfaction and quality-oriented approach, we take care to provide the highest level of service in every project.

Our Privacy Policy

    Customer privacy and information security are extremely important to us.

Follow Us

Follow us on social media to follow our innovations and projects:

You can contact us by filling out our contact form or calling our phone number.

© 2024 Powered by Fovimarlo Digital Media. All rights reserved